Based how vital and just how much manpower you've got allotted, you must at least conduct Sodium Nitrite and Conductivity testing every month. At least 800 ppm of Nitrite needs to be maintained in the boiler water to reduce corrosion. Solids could both be suspended while in the boiler h2o, https://www.interjayachemindo.com