Silt fences have to even be monitored for sediment build up. If sediment Construct up has reached fifty percent of the peak from the fence, it needs to be removed. Make certain that the geotextile fabric is buried deep more than enough making sure that water doesn't run under it. https://keegan6cmvc.blogdal.com/32686666/the-greatest-guide-to-spraying-construction-soil