The 25mm thick major metal tube is pushed Together with the end closed by a metal shoe. On reaching the essential driving resistance, a full size cage is lowered in for the tube and filled with higher slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://castinsitupilesindhaka47334.bloguetechno.com/details-fiction-and-cast-in-situ-piles-in-bangladesh-67697387